Curtain wall glazing being installed on a tower under construction
New Construction

New construction windows and doors.

Window wall, curtain wall, storefront and entrance systems, installed floor by floor and sequenced to the site schedule. Supplied and fitted by our own certified crews.

The Service

Glazing that keeps pace with the build.

On a new build the glazing is on the critical path. Nothing inside starts until the building is closed in, so the schedule matters as much as the specification. [COMPANY NAME] installs to the sequence the site is working to, floor by floor, and keep pace with the trades ahead and behind us.

Window wall sits floor to floor between the slabs and is the system most residential towers use. Curtain wall hangs as a continuous skin past the slab edges. They are engineered differently, installed differently and priced differently. [COMPANY NAME] works in both, and will tell you which one your drawings actually call for.

  • Window wall, curtain wall, storefront and aluminium entrance systems
  • Thermally broken frames specified to the building
  • Acoustic glazing where the site calls for it, stepping up from standard 3mm to 6mm glass near rail lines, highways and flight paths
  • Floor-by-floor sequencing around the site schedule
  • Shop drawings and stamped engineering where a permit needs them
New building with its window wall system going in
Safety

Access and site protection before the first unit goes up.

New builds are busy sites with other trades working below [COMPANY NAME] crews. Hoarding, overhead protection and pedestrian routing go in before we start lifting glass, and every crew on an elevated face is certified for it.

Read the Safety Program
What It Has To Survive

What a Toronto envelope is built to take.

A new envelope is specified once and then lives with the consequences for decades. These are the three loads that decide whether the specification was right.

Thermal load

Deep cold to direct summer sun, every year.

The same facade handles deep cold and direct summer sun. Thermal breaks and the right glass makeup are what stop that range turning into condensation, drafts and heating cost once the building is occupied.

Wind at height

Pressure rises the further up you go.

Wind load at the top of a tower is nothing like the load at street level. Glass thickness, anchorage and framing are sized to the building’s actual calculated loads, not to a general specification.

Water management

The system is designed to drain, not only to seal.

No sealed joint stays perfect forever. A properly detailed system assumes water will get past the outer line and gives it a path back out, which is why flashing and drainage detailing matter more than the sealant bead.

Get the specification right at this stage and the building is quiet for thirty years. Get it wrong and it becomes a restoration project. A large share of tower replacement work traces back to decisions made during construction.

Questions

New construction, answered.

Window wall sits floor to floor between the slabs and is common in residential towers. Curtain wall hangs as a continuous skin past the slab edges. They are engineered, installed and priced differently, and we work in both.

Yes. If the engineering is already done we build to those drawings. If it is not, shop and architectural drawings come through Apollo Building Group, the engineering firm we work with, so the work is stamped and meets building code.

On a new build the system is usually set by the drawings, and that gets confirmed at the site visit. We are an authorized installer for Regal Aluminum and Reynaers Aluminium, which is what keeps the manufacturer warranty on those systems intact.

Yes. Aluminium entrance systems, terrace doors and steel fire-rated doors are part of the same scope, with push-bar hardware, automatic openers and key-fob access control fitted at the same time.

That is the normal way [COMPANY NAME] works. Installation runs floor by floor to the site schedule, with the access plan and material storage agreed at the site visit so we are not competing with other trades for the same space.

Have a question that isn't covered here? Ask us directly

Tell us about your project.

Tower or home, send us the details and we will come back to you within one business day.